Cracker Machinery & Industrial Steam Boiler Systems
Commissioned Plant Case Study

Integrated Cracker Production Line Installation (500 kg/hr)

Pabrik Kerupuk Sidoarjo Sentosa Mandiri • Commissioned: August 2026 • Cracker Manufacturing & Plant Lines

Turnkey design and fabrication of an industrial integrated cracker processing line rated at 500 kg/hr in Sidoarjo. The project encompasses a 200 kg SS304 double ribbon mixer, continuous 3-roll sheeting machine, multi-track rotary cutter, and a 750 kg/hr biomass fire-tube steam boiler powering 4 anti-drip steaming chambers.

Instalasi mesin Integrated Cracker Production Line Installation (500 kg/hr)
Engineering Narrative

From Initial Bottleneck to Turnkey Commissioned Operation

Here is how our engineering team analyzed the customer process, designed the custom machinery layout, and proved operational output targets.

01

Initial Challenge & Bottleneck

The customer faced severe throughput limitations due to manual batch handling, inconsistent dough thickness, and high energy costs from outdated steam equipment.

• High Labor & Inconsistent Slices
02

Custom Engineering Solution

We engineered a synchronized continuous line with food-grade SS304 machinery, high-torque helical gear transmission, and an optimized fire-tube steam boiler.

• 100% SS304 + Automated Steam
03

Proven Operational Impact

The line achieved 100% target tonnage immediately upon commissioning, reducing fuel costs by over 25% and cutting product scrap to under 1.5%.

• +45% Output & -25% Fuel Cost

Configuration Breakdown

Commissioned Engineering Parameters

kapasitas lini 500 kg adonan kerupuk jadi / jam
lingkup mesin Mixer 200kg + Sheeter Rolling 3-Rol + Slicer 3-Track + Steamer Box 4 Troli + Boiler 750 kg/jam
sumber energi Steam Boiler Uap Biomassa Pelet Kayu 0.7 MPa (Hemat Bahan Bakar 45%)
material standar Full Stainless Steel SS304 Food-Grade Contact Saniter BPOM
durasi instalasi 6 Minggu (Fabrikasi, FAT Workshop, Instalasi On-Site & Commissioning)

Core Equipment

Primary Installed Machinery Unit

Steam Boiler for Cracker Production

Fire-Tube Steam Boiler for Cracker Processing

Stable Saturated Steam Supply 0.7 – 1.0 MPa for Industrial Steaming Loads